howbadisthetrain

NYC · computed from MTA data

Which line is actually the worst

Every line ranked by the MTA's own Customer Journey Time Performance — the share of trips completed within five minutes of schedule. Latest published month is August 2026.

This is not a vibe score. Every number on this page comes from the MTA's published monthly performance data, and where the MTA publishes nothing we show nothing.

#LineOn time, August12-mo avgvs last yearTop delay causeLast 12 months
1S99.2%98.9%▲ +0.1 pp—
2792.5%90.7%▼ -0.5 ppInfrastructure & Equipment
3191.8%91.0%▲ +0.7 ppInfrastructure & Equipment
4490.5%88.9%▲ +0.2 ppInfrastructure & Equipment
5389.9%88.4%▼ -1.0 ppInfrastructure & Equipment
6589.2%87.8%▼ -0.6 ppPolice & Medical
7289.0%86.7%▼ -0.2 ppInfrastructure & Equipment
8688.9%87.5%▼ -1.6 ppPolice & Medical
9L87.8%90.5%▼ -0.5 ppInfrastructure & Equipment
10E87.6%87.1%▼ -0.5 ppPlanned ROW Work
11W87.0%88.0%▼ -2.9 pp—
12A83.8%85.2%▼ -0.8 ppPlanned ROW Work
13M83.6%81.3%▲ +1.0 ppInfrastructure & Equipment
14F83.0%83.1%▼ -0.6 ppInfrastructure & Equipment
15R82.4%84.0%▲ +1.5 ppInfrastructure & Equipment
16J82.2%81.2%▼ -0.2 ppInfrastructure & Equipment
17Z82.2%81.2%▼ -0.2 ppInfrastructure & Equipment
18C81.0%82.5%▼ -2.0 ppInfrastructure & Equipment
19G80.8%80.6%▼ -1.2 ppPlanned ROW Work
20N80.2%81.6%▼ -1.4 ppInfrastructure & Equipment
21Q79.9%79.3%▼ -0.7 ppInfrastructure & Equipment
22D79.1%80.6%▲ +1.3 ppInfrastructure & Equipment
23B78.2%78.9%▲ +1.4 ppInfrastructure & Equipment

Ranked by peak-hour performance. Percentages are the share of rider trips finishing within five minutes of the scheduled time — higher is better. The sparkline covers the last 12 published months.

Improved most, year over year

  • RR train▲ +1.5 pp
  • BB train▲ +1.4 pp
  • DD train▲ +1.3 pp

Slipped most, year over year

  • WW train▼ -2.9 pp
  • CC train▼ -2.0 pp
  • 66 train▼ -1.6 pp

What actually delays the trains

Every recorded delay across the network, grouped by the MTA's own cause categories and summed over the last 12 published months.

  • Infrastructure & Equipment29.3% · 685,026
  • Police & Medical21.3% · 498,962
  • Planned ROW Work20.8% · 487,202
  • Operating Conditions13.2% · 308,951
  • Crew Availability13.1% · 307,136
  • External Factors2.2% · 51,243

Where this data comes from

The MTA publishes monthly performance data as open data. This page reads four of those datasets, keeps the last 59 months, and computes the rankings, trailing averages and year-over-year changes above.

  • Customer Journey Time Performance — the headline number, and what the ranking is built on. The share of rider trips that finish within five minutes of the scheduled time, by line and month.
  • Terminal On-Time Performance — the share of trips arriving on schedule at the terminal.
  • Wait Assessment— the share of platform waits that fall within the scheduled headway, which catches the "train is running but you waited twelve minutes" problem.
  • Trains Delayed by Cause — the six cause categories behind the delay bars above.

Known limits, stated plainly

  • The MTA publishes monthly, about two months behind. The latest month here is August 2026, and it will not move until the MTA publishes the next one. Nothing on this page is real-time.
  • J and Z are reported jointly. The MTA measures them as one series because they share a track and a service pattern, so both line pages show the same figures rather than an invented split.
  • SIR isn't covered.The Staten Island Railway is not part of the subway metrics datasets, so it gets no ranking here. We'd rather leave it out than estimate.
  • The shuttles are combined. The MTA reports the three shuttle services separately; this page combines them into the single S the map shows, weighted by riders.
  • Monthly averages hide bad days. A line at 85% for the month still had individual trips that were far worse, and the figure says nothing about crowding — the MTA does not publish per-car crowding data at all.

Data source: MTA open data on data.ny.gov. Snapshot generated 2026-10-05; latest published month August 2026.

Back to the line list — or read how the scores work.